




Overview
Timmons Group evaluated all existing parking lots and driveways at the NCNG Readiness Center in Raeford, NC, and provided geotechnical design expertise for improvements to existing lots and the development of new ones. The site evaluation included engineer site visits, geotechnical core sampling in existing and proposed parking areas, and preparation of a 43-page comprehensive report containing maps, photographs, and construction recommendations for each lot and driveway.