Project Summary
Timmons Group provided design and construction administration services for the Poor Creek Wastewater Pump Station Equalization Tank. This project was part of the overall Poor Creek Wastewater Pump Station Upgrade and it included the construction of an 87’ diameter, 34’ tall, 1.4 million gallon equalization basin onsite to retain flows during peak flow events.


