Branders Bridge Corridor Improvements

Project Summary

This project involved 2500’ of safety improvements along a corridor comprised of inadequate horizontal and vertical curves.  The project is located in an area experiencing a surge of residential development.

Project Highlights

The project replaced a major culvert crossing that was overtopped frequently.  The new design protects the road on a 10-year flow.  This project also eliminated two horizontal curves that did not meet the requirements for the 45 mph operating speed and one inadequate vertical curve.