Bearkat II Wind Project

Project Summary

Timmons Group is preparing the engineering design of the Bearkat II step-up substation, collection system and transmission line in addition to performing all the associated engineering studies for the project. The project is a 162.15 MW generation facility located in Glasscock County, Texas consisting of 47 Vestas V126 3.45 MW wind turbine generators on seven collector circuits and a 34.5/345 kV project substation. The Project connects to the system through the Bearkat I Project Substation by way of a 6.5 mile, 345 kV line.